The Town of Mansfield is working on a water line near the Storrs Center construction site. This work will limit traffic on Dog Lane to one lane, and at times, there may be a need to stop traffic briefly in both directions. This work is anticipated to continue through next week.
As work progresses on the buildings, the number and frequency of delivery of materials will increase.
The general contractor is working to coordinate deliveries as much as possible to minimize any potential traffic impact. Motorists, cyclists, and pedestrians are encouraged to use caution when traveling through the area and to be prepared for possible delays.