October 5, 2011

Construction Continues

The panelized construction of the residential floors is continuing for both TS-1 and DL-1/2 (the former is at the corner of Storrs Road/Route 195, and the latter is along Dog Lane).


The panels arrive bundled together and are lifted onto the building by a crane.  The panels have been custom-made for the buildings.  Installation is an efficient process.



Meanwhile, on the first floor, the steel studs are being installed.  With the studs in place, the outlines of the commercial spaces are becoming visible.