March 5, 2012

Exterior Work Continues

The exterior work on the buildings in Phase 1A of Storrs Center - 1  Dog Lane and 9 Dog Lane - progresses while the construction of the parking garage continues.  Work on the sidewalks along Storrs Road is also underway.

9 Dog Lane
Rendering of 9 Dog Lane
Image courtesy of BL Companies Architects



1 Dog Lane - as seen traveling south on Storrs Road/Route 195
Rendering of 1 Dog Lane - as seen traveling south on Storrs Road/Route 195
Image courtesy of BL Companies Architects

Construction of the parking garage is progressing steadily.

March 2, 2012

Pedestrian Alert: Sidewalk Work

Part of the Storrs Center project is to improve pedestrian access in the area with wider sidewalks, landscaping, hardscaping, and improved crosswalks.  Work on the sidewalk to the west of Storrs Road/Route 195 (the Town Hall side of the road) will begin Monday.  Work will begin at the intersection of Storrs Road and South Eagleville Road (Route 275) and progress northwards.  The sidewalk will be inaccessible during this time.  Pedestrians are encouraged to use the sidewalk on the opposite side of the street.

Storrs Road

February 27, 2012

A few snapshots. . .

1 Dog Lane

The precast installation is progressing.

Another view of the garage under construction

February 17, 2012

Garage Progresses

Delivery of the pre-cast material for the parking garage has begun.  The pieces are produced off-site and delivered ready for placement.  Here, a large piece can be seen in transit:


The pieces are modular for ease of installation.  (In the photo below, One Dog Lane is in the background.)


The pieces are lifted into place by a crane, seen below at left.  In the foreground, a pre-cast section of a stairwell is visible.


The first two pieces have been placed:



The delivery and erection of the precast materials will continue over the coming weeks.  As noted previously, there may be traffic delays in the area as the delivery vehicles navigate the site.  Motorists, cyclists, and pedestrians in the area should proceed with caution.  Please note that Dog Lane is closed to through traffic during the day.



February 9, 2012

Traffic Alert: Materials Delivery

On Monday, February 13, delivery of the pre-cast materials for the parking garage will begin.  This will increase truck traffic on Storrs Road and may cause traffic delays on Dog Lane (which is currently closed to through traffic).  Residents, visitors, and workers are advised to proceed with caution through this area.  While every effort is being made to manage traffic flow, there may be delays as the construction vehicles navigate the site.

Please remember to drive slowly through the construction area and maintain a safe distance between yourself and oversized vehicles.