Delivery of the pre-cast material for the parking garage has begun. The pieces are produced off-site and delivered ready for placement. Here, a large piece can be seen in transit:
The pieces are modular for ease of installation. (In the photo below, One Dog Lane is in the background.)
The pieces are lifted into place by a crane, seen below at left. In the foreground, a pre-cast section of a stairwell is visible.
The first two pieces have been placed:
The delivery and erection of the precast materials will continue over the coming weeks.
As noted previously, there may be traffic delays in the area as the delivery vehicles navigate the site. Motorists, cyclists, and pedestrians in the area should proceed with caution. Please note that
Dog Lane is closed to through traffic during the day.