September 20, 2011

Moving on up

The framing of the upper floors on building TS-1 (at the corner of Storrs Road and Dog Lane) has begun.  The panelized construction process involves custom panels that were fabricated off-site for this building and then delivered and installed. 

Panelized construction helps to streamline the building process on site.  It also helps to reduce the amount of waste generated on-site throughout the building process as the panels are created specifically for each building.

There should be no major changes in traffic during this process.  However, an occasional delay may occur as the daily deliveries of equipment and materials continue.